Case Study : Assembly Line Design And Installation

Client : Off-Highway OEM
Requirement : Need For New Assembly Line Because Of Increased Market Demand
Duration : 18 Months
Efforts : 72 Man-Months
Benefits to Customer
  • Reduced Manpower From 62 To 47 For The New Line
  • Merged 3 Products (Original Plan Was For 2 Products) On The Same Line Without Affecting Throughput
  • Cost Savings In Terms Of Space Required For The Third Model 800 Square Meters